A kit of parts

The sway frame is going together beautifully. The timber frame team have bolted the base plates to the concrete slab, and slotted the glulams into place.

image    image    image

The sway frame has been designed and built to carry the weight of the triple glazed south facing units, and to stand up to the prevailing south westerlies.

 

The Structure

The Passivframe

image

The timber structure is a work of art and watching the frame being assembled on site is  fascinating.

These are the glulam beams that cantilever out over the ground floor to provide structure at first floor.

image   image   image

MVHR duct routes are pre-cut in the frame. You can see the holes in the floor joists ready for the duct work.

Stage Two – The Timber Frame

image

We have walls !

The timber frame team have been on site this week and have drilled and anchored the sole plate to the slab creating an airtight seal.

They have started to erect the external walls from 300mm (pre-cut factory made) I beams.

image   image   image

The frame is being erected at a cracking pace…..

image

Not so sleepy

IMG_5502

The first concrete delivery arrived at 7am Tuesday. (1 of 4)

IMG_5494

The soon to be hidden pipes and mesh.

 

IMG_5507.mov

The concrete polishers hard at work.

 

IMG_5509

After a day of power floating the floor has set beautifully.

A busy week

image   image   image   image

It has been a busy week.

The radon barrier (yellow plastic sheeting) was carefully laid over the top of the sand blinding.

EPS 70 insulation was laid in 3 layers of 100mm. The hot and cold water pipes were chased into the top layer of insulation. The DPM was laid over the top of the insulation, and then the underfloor heating installed to the entire ground floor area.

The scaffolding team have erected a temporary structure over the footprint and our very good friends Rob and Sandra gave up their evening to help us tie down the canopy over the frame allowing for a watertight environment when pouring the slab.

 

 

Frame delivery

IMG_5390   IMG_5394

The timber frame arrived today from the woodworks in Gloucestershire as pre-cut factory made I beams and joists.