We now have Steve on site laying a single ply membrane over the box gutter, garage roof and balconies.
The box gutter to the main house under construction.
The garage roof under construction.
The box gutter to the garage roof under construction & the fly screen to the underside of the coping, garage wall.
The balconies each have a beautiful box gutter made of birch ply set within the structure. These will eventually be covered over with the membrane to allow the balconies to drain properly.
Gary, Will and John are fixing sheets of birch ply to the roof battens ready for the final roof covering.