Internal finishes and fittings

image  IMG_1689  IMG_1722  IMG_1717

Asaf has installed the oak staircase, and Ding is laying the Junkers oak floor upstairs.

IMG_1524 IMG_1544 IMG_1564

IMG_1668  image

Shower enclosures are getting tiled and plumbing ongoing.

IMG_1694  IMG_1721  IMG_1715  IMG_1577

 

Leave a Reply

Your email address will not be published. Required fields are marked *