The radon barrier (yellow plastic sheeting) was carefully laid over the top of the sand blinding.

EPS 70 insulation was laid in 3 layers of 100mm. The hot and cold water pipes were chased into the top layer of insulation. The DPM was laid over the top of the insulation, and then the underfloor heating installed to the entire ground floor area.

The scaffolding team have erected a temporary structure over the footprint and our very good friends Rob and Sandra gave up their evening to help us tie down the canopy over the frame allowing for a watertight environment when pouring the slab.

 

 